Tonight (2019-10-15) was a meeting of the Honeoye Falls-Lima Board of Education (BoE).
Before the meeting was another wandering of the construction site (ie school). The project is coming along nicely. Looks like the new office at the High School is now in use, and the new turf field looks to be (mostly?) done. Although the wall around the High School cafeteria looks rather bland, seems like a great place for some decoration. Especially because, when the project gets to that point, it will all be painted over. Maybe something for the annual Christmas decoration competition? Continue reading